Skip to main content

SOP


 






                                                                                                                    Implementation Department

                                                                         Standard Operating Procedure

                                                                                            12th September, 2022.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contents

1.      Introduction ………………………………………………………………………………………..3

1.1.      Purpose and Objectives …………………………………………………….………………3

1.2     Scope …………………………………………………………………………………….………….3

2.      Organogram…………………………………………..………………………………………….…4

3.      List of activities in the department…………………………………………………......5

4.       Procedures…………..…………………………………………………………………..…………6

5.      Process flow…………………………………………………………………………………..…….9

6.      SOP change log…………………………………………………………………………………….10

7.      Appendices…………………………………………………………………………….…………...11

1.   Appendix A: Pre-installation and Post-Installation check list…….11

2.   Appendix B: Installation policy document………………………………..12

3.   Appendix C:  SFCS Site inspection checklist………………………………14

4.   Appendix D: Client requirement for SFCS…………………………………16

5.   Appendix E: MFCS questionnaire……………………………………………..16

6.   Appendix F: client requirement for MFCS…………………………………18

7.   Appendix G: Procedural details for scheduling health checks…..19

8.   Appendix H: Health check feedback form…………….…………………..20

 

 

 

 

 

 

 

 

 

1.   INTRODUCTION

1.1 PURPOSE AND OBJECTIVES

The aim of this SOP is to create a well-defined and comprehensive document to highlight the work procedures and expected deliverables in the implementation department. This is also to ensure that all implementation staff work from the same perspective by having a written formula of the policy and procedure. It also serves to ensure:

i.                    A standard document is made available that guides all the staff of the unit regarding mode of operation.

ii.                  Consistency and continuity of our operation is guaranteed

iii.                Preservation of knowledge and the technical know-how in the departmental operations.

iv.                 A training guide is available for all existing members and new team members.

 

1.2  SCOPE

This standard operating procedure documents provides an insight into IoT (internet of things) solutions deployment in the concept nova implementation department. It also outlines the guidelines to achieve a proper and efficient installation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.   ORGANOGRAM

Text Box: Team Lead (Implementation Department)
One (1) Electrical/Electronic Engineer
IMPLEMENTATION DEPARTMENT STRUCTURE

 

 

 

 

                                                                                                        









 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 


3.     LIST OF ACTIVITIES/JOBS IN THE DEPARTMENT

The implementation department is saddled with the responsibility of deploying all concept nova’s IOT solutions. This is achieved by liaising with the Research and development, Sales, brokers and CEM to understand the type of solution to be deployed. We deal with individual clients and corporate organizations.

                                       

Below are the major concept nova solutions deployed by the implementation department:

1.      Vehicle Monitoring Solutions that include products like tikon basic, tikon hybrid, tikon prime, track and trace, prodrive, tikon match etc.

2.      Fuel Monitoring Solution in Stationary Tanks (stationary fuel control system-SFCS)

3.      Fuel Monitoring Solution in Mobile Tanks (mobile fuel control system-MFCS)

4.      Generator Monitoring Solution

5.      Power Monitoring Solution

6.      Vehicle Anti-shatter Solution (c-protect)

7.      In-vehicle Monitoring System (IVMS)

8.      Health checks are carried out on all the jobs 1-7 above as at when due/required.

 

 

 

 

 

 

 

 

                   

 

 

 

 

 

 

 

4. JOB PROCEDURES

 

WORK PROCEDURES FOR THE LISTED ACTIVITIES

 

 

 

 

 

 

Timelines

 

 

 

 

 

 

 

 

 

 

S/N

Activity

Description

Pre installation

Installation

Post Installation

TAKT Time (hours)

Cycle  Time (hours)

What determines Success

1

Vehicle Monitoring Solution

Involves hard wiring of Telematics (Trackers) in a vehicle. Our Tikon products and prodrive fall under this category. Product variations are most likely due to the type of telematics and back end configuration applied.

Involves knowing the functional state of the

vehicle prior to installation. See appendix A for pre-installation checklist

 

 

 

Telematics device is wired onto the vehicle circuitry following the laid down installation guidelines. See appendix B for Installation policy document.

Checks are done to ascertain that all vehicle systems are stable after the installation. See appendix A for post installation checks. Vehicle

details are sent to control

department and confirmation that the unit is reporting online and updating accordingly means job completion.

1.5

1

·         Good installation with no errors

·         Unit reporting online and certified by control department.

·         Vehicle/equipment in good working condition after installation

·         Report/feedback forms completed and duly sent to control department and departmental head for record keeping.

·         Strict adherence to approved timelines.

2

Fuel Monitoring Solution in

Stationary Tanks

This is done by installing sensors in stationary tanks. It also involves piping, cabling, installation of telematics and converters. Tank calibration is also a major aspect of this solution. Concept nova's stationary FCS (SFCS) falls in this category.

Site inspection is done prior installation. See appendix C for site inspection check list. Outcome of the site inspection will determine whether or not installation can be done. Client requirements are also sent.

Deployment of the SFCS is done following the laid down installation guidelines. Tank is calibrated accordingly. See appendix B for installation policy document.

Necessary checks are carried out to ensure that the system, especially the generator(s) connected to the tank is(are) fine. Details are sent to control and units are confirmed to be reporting real time. Confirmation that fuel data is captured.

7-10 (based on the capacity of the tank)

7--9

In addition to (1) above, accurate fuel data is a must for success.

3

Fuel Monitoring Solution in

Mobile Tanks

This involves installing sensor in the tank of trucks and other moving equipment that use diesel for their operation. Telematics

devices are also installed in the vehicle/equipment. Concept nova's mobile fuel control system (MFCS) falls in this category. Tank calibration is also a major activity in the deployment of this solution

A questionnaire is usually sent ahead of installation to know the type, capacity, tank orientation

etc.(appendix E) of the truck to be worked on. This ensures better planning ahead of the deployment. Client requirement is also sent ahead of installation see appendix F

Deployment of the MFCS is done following the laid down installation guidelines. Tank is calibrated accordingly See appendix B for installation policy document.

Checks are done to ensure the unit is reporting real time and accurate fuel data is being received. Details are sent to control department for record purpose.

6-8 (based on capacity of the tank)

5

same as (2) above

4

Generator Monitoring Solution

This is sometimes deployed as an add-on to the SFCS. It involves using telematics and a connection of relays/contactors to monitor generator activities.

A questionnaire is usually sent ahead of installation to know the type, capacity, and make of the generator. This ensures better planning ahead of the deployment. Client requirement is also sent ahead of installation

Installation of the generator monitoring solution is done based on the laid down installation guidelines. See appendix B for installation policy document.

Checks are done to ensure the unit is reporting real time and testing of the generator status is done. Details are sent to control for record purpose.

4

3

In addition to (1) above, generator status must be tested and certified ok.

5

Power Monitoring Solution

This involves using telematics and a system of relays/contactors to monitor power status of buildings, factories etc.

A questionnaire is sent ahead to have an idea of the site and power layout.

Installation of the power monitoring solution is done based on laid down installation

guidelines. See appendix B for installation policy document.

Checks are done to ensure the unit is reporting real time and testing of the power monitor for off and on, PHCN, generator etc. is done. Necessary details are sent to control department.

4

3

In addition to (1) above, power monitoring set up must be tested and certified ok.

6

Vehicle anti-shatter solution

It involves installation of clear films on the vehicle door glasses to prevent them from shatter incase a break- in occurs.

Inquiry is made to know the type of vehicle, whether tinted or not etc.

C-protect is done according to the laid down policies for

Installation

Necessary checks are done to ensure vehicle still functions as expected and there no bubbles present in the vehicle door glasses.

3

2

Good installation with no bubbles present.

7

In-vehicle monitoring system (IVMS

This involves the hard wiring of telematics, RFID, buzzers, ibuttons etc to completely capture driving activities and identify drivers.

Inquiry is made to know the type of vehicle(s) in order to plan a proper installation and to know the state of the vehicle

IVMS deployment is done based on installation guidelines.

See appendix for B for

Installation policy

Checks are done to ascertain that all vehicle systems are stable after the installation. See appendix A for post installation checks. Vehicle

details are sent to control

department and

confirmation that the unit is reporting online and updating accordingly means job completion.

2

1.5

As in (1) above

 

Health checks

Health checks are done as at when the need arises, especially when the vehicle(s)/asset don’t report real time on our respective platforms. This ensures customers get the expected value from our products.

See appendix G for procedural details for scheduling health checks and appendix H for health check feedback form.

 

 

 

 

 

 

 

 

 

 

 

 

 

5.     PROCESS FLOW

 

 

Rounded Rectangle: CEM and Brokers admin log the request in the installation sheet after sending client requirements and ensuring client acknowledges 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


6.     SOP CHANGE LOG

This a new SOP. To be reviewed yearly.

 

Version History

 

Version #

Author

 

 

Version date

Revision date

Approved by

Approval date

Reasons/Details

Of Changes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.

 

 

 

 

 

 

 

 

 

 

7.     APPENDICES

 

1.       APPENDIX A

Product Installation and Maintenance Check List

Section A: (To be completed by Technician/Engineer)

Client’s Category:


Personal/Company’s Information

Vehicle/Asset Information

Name:

Make/Model:

Policy Number:

Registration Number:

Address:

Year:

Phone Number:

Colour:

Email Address:

Chassis Number:


Contact Person Met:

Phone Number of Contact Person:

Product Name:

Unit ID:

Device Location in the Vehicle:

Mileage/Odometer:


Safety Procedures

Pre-Installation

Post Installation

Remarks

OK

NOT OK

OK

NOT OK

Check all Dash Board lights, e.g. Engine lights, Battery light, etc.






Fog/Driving Lights






Brake Lights






Reverse Lights






Head Lights






Trafficator Lights (Signal Lights)






Windshield Wiper






Horn






Car Stereo






Air Conditioner (AC)






Power Window






Engine Start






Other components in the vehicle







Any other Comments: ___________________________________________________________________________________

_____________________________________________________________________________________________________

Section B: (To be completed by the customer/contact Person met)

Name of Technician:

Phone number of Technician:

Date of Installation:

Time of Installation:

Text Box: Rate the Services rendered by the Technician:

                                                                                                                                                                                                                  

                                                                                                                                                                            

Remarks:


Customer’s/Contact person’s Signature: _____________________                  Date: _____________________

Technician’s/Engineer’s Signature: _________________________   Date: _____________________

 

 

 

2.       APPENDIX B

Precautions, Policy Installation Document, Dos and Don’ts for Installers

Introduction:

This Policy document, Precautions, Dos and Don’ts for installers is meant to guide the installer (Technician/Engineer) to professionally install Telematics devices on any vehicle. All Installers must adhere strictly to these guide lines to avoid any mishap before, during and after installation.

The document is open for frequent revision and update.

The following guide must be followed before, during and after installation:


1.       Do not install it in an environment which is over GSM performance index (ensure GSM network is available in that area before proceeding with installation).

2.       Never place the GPS antenna where metallic substance can impede its signal and transmission.

3.       Place the GPS in position such that transmission will not be impeded.

4.       Ensure no metal object is placed over the GPS.

5.       Never place the device at visible locations where the client or any other person can see it. Pay attention to make installation location free from water and dust. Make sure the device is placed at distance of at least 30cm above the vehicle’s ground level.

6.       Do not carry out any installation in basement or under an area covered with thick concrete.

7.       Never leave loosed wires unpacked and scattered. Use tie rap to secure cables, device firmly and neatly.

8.       Ensure that there is a fuse connected to the Positive (+ve) Power (+VCC) of the Telematics device. This will ensure the safety of the telematics device in case of any Short Circuit or bridge in the internal circuitry of the vehicle or asset been installed. Always demand for a fuse, if there is not fuse on the device.

9.       Ensure the device is not powered beyond or below the required voltage to avoid damaging the board. Required voltage 12V – 24V for Tikon, Coban, etc.

10.   Locate a concealed point in the vehicle, where the device can be kept.

11.   Upon installation, determine where your cable will run through and where you want to tap your source of power for the device.

12.   Avoid taping into or cutting through any twisted cables or any communication cables in the vehicle. These are communication/CAN BUS cables.

13.   Never divulge information that matters to the company while on a job (Installing the Tracker)

14.   Never take what is not yours while on a job.

15.   Installer must be courteous to customers and in no account get angry with a customer, maybe due to their behavior or whatsoever.

16.   An installer must ensure that his installation job is certified by the control officer before departing the location.

17.   An installer must not go on a personal job with Concept Nova customer as this will amount to serious offence.

18.   An installer must appear neat and well-dressed before a customer.

19.   An installer is not allowed to train or transfer his knowledge on installation to a third party without notice of Concept Nova Ltd.

20.   Never drive the client’s car/vehicle.

21.   Ensure that you are alone when installing the device.

22.   Never take decisions on your own without contacting the control room or your superior when installing the device.

23.   If there is an issue with the car/vehicle or client at the work site either due to your mistake or otherwise, contact the head of department or your superior immediately.

24.   Never assume anything when installing the device.

25.   Never leave the site without the customer certifying that his/her vehicle is working fine and in previous condition before installation.

26.   Never leave installation site untidy.

27.   Check with the client on arrival, the working condition of the vehicle before proceeding with installation.

28.   Ensure all components in the vehicle are working properly, that is, Dashboard lights, Radio, Screen wiper, Head light, AC, and Window whine down and up, etc. before installation, if there is an issue with any of these components, kindly contact the clients before proceeding with installation.

29.   Ensure work area is convenient and spacious.

30.   Ensure that the device and all other components in the vehicle are working properly after installation before exiting the site.

31.   Ensure pictures are taken of how devices are installed, hidden, wired, and packed during and after installation.

32.   Ensure that devices (vehicles) details are properly documented using a predefined template and new discoveries or problems encountered are documented and a Hard and soft copy given to control officer and account officer for reference purposes. Also make a copy for yourself and your superior.

33.   Take pictures of the filled customer feedback form immediately installation is completed and send to control officer via the appropriate social media platform for processing.


3.      APPENDIX C

STATIONARY FUEL CONTROL SYSTEM (STATIONARY-FCS) SURVEY QUESTIONNAIRE

This questionnaire is to be filled by the clients before payment for the Stationary-FCS solution

 

Questions

1.

a)

Kindly state the Fuel product to be monitored?

 

b)

Kindly state the full Height of the tank?

 

c)

What number of tanks are to be monitored on a site?

 

d)

Kindly state the Tank Capacity (Tank Volume)?

 

e)

Kindly State the shape and orientation of the tank?

 

f)

Is there a calibration chart documentation available for the tank?

 

g)

Is there an available power source within close proximity of the tank?

 

h)

Kindly attach pictures of the tank and its immediate surroundings?

 

2.

a)

Are there any structural peculiarities to the tank?

 

b)

Does the tank have separators within it or any other erections?

 

c)

Is a generator being fed directly by the tank?

 

d)

Kindly state how many generators are connected to each tank on the site?

 

 

3. Any other comments                                                                                                                              

                                                                                                                                                            

                                                                                                                                                                                                  

 

Client contact person               :                                                                                                                       

Position                       :                                                       

Signature and date    :                                                                                                                       

Disclaimer:  Concept Nova is not responsible for any errors or omission connected to filling this questionnaire by the client, as any variation from the accurate data filled would or can result to a price change

 

 

 

 

 

 

 

4.      APPENDIX D

5.      APPENDIX E

MOBILE FUEL CONTROL SYSTEM (MOBILE-FCS) SURVEY QUESTIONNAIRE

This questionnaire is to be filled by the clients before payment for the Mobile-FCS solution

 Questions

1.

Number of vehicles to be monitored

 

2.

How many tanks are on each vehicle?

       ______   Vehicle(s) with    ________  tank(s).

       ______   Vehicle(s) with  _________  tank(s).

       ______   Vehicle(s) with  _________  tank(s).

3.

How many of the tanks to be monitored are above 0.7m in height?

 

4.

Are the tanks to be monitored the main or auxiliary tanks of the trucks?

 

5. Any other comments                                                                                                                                    

                                                                                                                                                                                 

                                                                                                                                                                                                                 

 

Client contact person               :                                                                                                                       

Position                       :                                                                                                       Signature and date             :        

6. APPENDIX F

6.      APPENDIX G

 

Procedural details for Scheduling Health Check

1.       The Technical support executive in the control room, checks the GPSWOX and WIALON platforms continually for offline vehicles ( Offline vehicles are vehicles that are not reporting in real time on the platforms)

2.       The Technical support immediately sends an offline notification email to the client(s) whose vehicles have been offline for twenty-four (24) hours or calls the client if client is non-responsive to the email after 12 hours.

3.       Responses from clients that clearly depict car repair issue, car battery removal or vehicle condemnation are logged on the Control Google sheet as offline vehicles and if after two weeks still appears offline on the platform, clients are called again by the Technical support

4.       Responses that signify normal vehicle working condition would be scheduled immediately for health check at the client’s earliest convenience by the Technical support.

5.       Technical support logs clients’ details for health check on the subscription Google sheet where implementation and client experience executives also have access and can view in real time.

6.       Implementation executive fills the Client site health check list form based on the results in the field during the health check

7.       Implementation executive submits an accurately filled Client site health check list form to the Control room

8.       Technical support sends client details to business support via email (clients demographic data)to raise and send an invoice to the client based on health check charges for logistics of implementation team

9.       Technical support sends an online notification mail to clients immediately vehicle is online on the platform.












7.      APPENDIX H


HEALTH CHECK FEEDBACK FORM

                                                                                                                                    Date: ______________

Name of Client/ Category______________________________________________________________

Phone Number _____________________________________________________________________

Address­­­­­­­­­­­­­­­   ___________________________________________________________________________

Vehicle Make /Model__________________________________________________________________

Reg. Number    _______________________________________________________________________

Chassis Number_____________________________________________________________________

Contact Person ____________________________________ Phone __________________________

Device Number /IMEI    _______________________________________________________________


Observations from Health Check


Device and vehicle status before health check

Device and vehicle status after health check

Comments

1.




2.




Customer’s Section (to be completed by the customer/contact person met)

Name of Technician_____________________________________________________________________

Date/Time of the Health Check __________________________/_________________________________

Other Remarks/Comments       __________________________________________________________

________________________________

8.      APPENDIX I

Materials / tools for FCS installation.

1.       Drill machine ( Cordless)

2.      Circular saw ( verify the size and it is available and functional)                                                     

3.      Drill bits ( verify size needed) and grinding stones

4.      Rivet tool

5.      Rivet nuts

6.      Bolts and screws

7.      Bow saw

8.      4 core cables

9.      PVC pipes

10.  Flexible conduit

11.  Silicon Sealant

12.  Water and soap

13.  Foam or rags to clean

14.  Gasket

15.  General tools

16.  Flow meter

17.  Multimeter

18.  Capacitive probe and a spare

19.  Telematics Device ( all configured on platform)

20.  Tie wraps

21.  Shrink wraps and a gas lighter

22.  Measuring Containers and measuring beakers

23.  Gas taper

24.  Gloves

25.  Fishing tape

26.  Centre punch

27.  Vernier caliper 

28.  Paper tape

29.  File (round and flat)

30.  Emery cloth

31.  Pipe wrench

 

 

 

 

APPENDIX J

Pre-installation

Pay a site visit or get across to the client via a questionnaire to determine;

1.      The size of the tank

2.      The kind of fuel/liquid to be monitored

3.      Height of the tank

4.      The number of tanks to be monitored

5.      The capacity of the tank

6.      The shape and orientation of the tank

7.      Whether or not a calibration chart is available for the tank

8.      Availability of a power source within close proximity of the tank.

9.      Whether or not a generator is being fed directly from the tank.

10.  Are the tanks to be monitored the main or auxiliary tank of the truck

11.  Any other necessary information.

 

1.1  Installation

1.      Get to the installation site early (preferably in the early hours of the morning).

2.      Ensure all the client requirements are met.

3.      Ensure you check if the truck is in good working condition (see appendix for mobile FCS installation checklist)

4.      Start by identifying an even portion of the tank.

5.      Clean the area of the tank you intend to install your probe.

6.      Put a template on the already cleaned area and mark points to be drilled using a center punch.

7.      Use small drill bit, preferably 1mm to drill the holes marked by the center punch.

8.      Enlarge the middle hole such that the drill bit of the circular saw provided can fit in.

9.      Using the hole in (8) above as the centre, cut the top of the tank with a 35mm circular saw fastened to a drilling machine.

10.  After cutting the hole, check to make sure the probe fits in the hole.

11.  Using a PVC pipe, mark the height of the tank by dipping the PVC pipe inside the tank.

12.  Using the height obtained in (11) above, cut the probe to the desired length.

13.  Drill the other holes surrounding the 35mm hole to a diameter of 7mm.

14.  Using the riveting tool and the rivets provided, fasten the rivets to the 7mm holes.

15.  After calibrating the probe for full and empty values, insert the probe into the tank. ( see section on probe and tank calibration)

16.  Fasten the probe to the tank with the screws provided.

17.  Use silicon gum round the areas between the probe and the tank to prevent future leakage.

·         The next step is tank calibration

 

9.      APPROVAL

 

This SOP is approved by

 Name: ______________________________________________________________

Signature: ___________________________________________________________

Designation:­­­­­­­­­­­­­­­_________________________________________________________

Date:_______________________________________________________________